EasyManua.ls Logo

Zip HydroTap G5 BC100 - Page 32

Zip HydroTap G5 BC100
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Quick Start Installation Guide
807118UK v1.12 12.23 G5 BC Quick Start Guide
SECTION 12: Commissioning
12.8 Boiling calibration and cleaning
Read the on screen information.
BC systems offer combined boiling
calibration and cleaning.
Touch the green arrow to run.
BOILING CALIBRATION & CLEANING 12:12 PM
This will optimise the performance of the boiling
unit and perform chilled cleaning.
Info
CAUTION: Steam may vent from the tap spout.
Avoid touching the spout during this process.
Chlorinated water will be dispensed from the tap
during the cleaning process.
Boiling calibration and cleaning process
begins.
Monitor the on screen information.
Touch Chilled cleaning forward arrow to
view screen of cleaning process.
Note If ‘Chilled cleaning’ text is flashing
there is a required action on that screen
to perform (empty cold tank).
100.0
12:12 PM
Calibrating
Cleaning
BOILING CALIBRATION & CLEANING
Boiling Water Temp.
Steam Vent Temp.
Element Power %.
O
C
74.5
O
C
60
Hot
Safety
CHILLED CLEANING 12:12 PM
Pause:
Cold
Safety
Cleaning in
progress.
This will take 8 min
Cleaning process begins.
Monitor the on screen information.
Note This is automatic unless ‘Font’
was selected in the drain away option
selection screen (see section 12.4). In this
case a manual dispense action may be
requested.
CHILLED CLEANING 12:12 PM
Pause:
Cold
Safety
Cold tank emptying
for post-flush
[Normal operation]