EasyManua.ls Logo

ZKTeco CMP-300 - 7 Control Board Wiring Installation

ZKTeco CMP-300
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CMP-300
User Manual
Page | 15 Copyright©2021 ZKTECO CO., LTD. All rights reserved.
7 Control Board Wiring Installation
Remove the wiring cover of the barrier gate main controller.
Refer to the wiring diagram of the barrier gate controller and connect
the lines one by one firmly. (Note: Power must be disconnected before
installation or maintenance.)
After checking and confirming reliable wiring, install the wiring cover
back.
Install the Desktop Remote Control: Place the Desktop Remote
Control on the table in the guard room or attach it to the wall and
plug-in the power.
The wiring diagram of the controller is as follows:

Related product manuals