/ 9
4
ASSEMBLY
Choose a smooth and clean surface.
IF THE BUOYANCY TUBE WAS STORED AT A TEMPERATURE
BELOW 0°C / 32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS
BEFORE UNFOLDING.
THE H2P INFLATABLE FLOOR:
H2P INFLATABLE FLOOR DEFLATED
Your boat is delivered with the inflatable floor and its keel already assembled.
Cadet fast roller Acti-V - Air floor Inflating procedure:
• Before inflating, open out the boat and position the keel on the central band of the bottom and on
the floorboard axis (centered between the positioning pins).
• FIRST inflate the keel-floorboard assembly to its rated pressure.
• Check that the keel inflated perpendicular to the floorboard and that it is still positioned on the
central band of the bottom (otherwise, reposition).
• Inflate the main buoyancy tube.
• Press the floorboard down around the edges to fit it into the hollow of the angle.
MAINTENANCE / DISMANTLE OF THE H2P INFLATABLE FLOOR
We recommend that you leave the H2P floor in the boat when folding.
To clean perfectly the boat proceed as follow :
Deflate the boat and the floor.
inflate again the boat a little.
Wash off with clear water, then raise the boat’s nose to evacuate water and sand or rubbish.
Do not separate the keel from the floor nor from the buttom.