Installation manual 2N® IP Force
Suppose that all the required cables have been carried into the drilled hole.
Now follow the instructions applicable for classic brick flush mounting.
However, remember that thermally insulated walls show less strength than
classic brick walls.
Flush Mounting – Plasterboard
Use the plasterboard flush mounting box and follow the instructions
included therein.
•
•
•
Caution
The hole depth depends on the insulation layer thickness. If the insulation layer is rather thick, you
may need longer screws! If there are hollow bricks under the insulation, make sure that your screws
pass through the whole dowel (50 mm) and fix the dowel reliably.
Make sure that the dowel holes have the required diameter. If the diameter is too large, the dowels
may get loose. Use some suitable building adhesive to keep the dowels in place.
Make sure that the hole depth is sufficient too! The dowel length is 50 mm and the screw length is
90 mm.