EasyManua.ls Logo

3MINDWAVE APEX REBELS MOTION - Maintenance and Service

3MINDWAVE APEX REBELS MOTION
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 104
6. Maintenance and Service
6.1 Maintenance and Service
If the operability of the Control Unit is unsatisfactory, or if settings on the test mode calibration screen are
ineffective, the problem could be a defective mechanism, displacement of the position where volume or
microswitch has been fastened or malfunctioning of volume or microswitch.
Carry out the following procedure to replace Control Unit or microswitch. Also be sure to grease the mechanical
components of the Control Unit once every 3 months.

Table of Contents