A. O. Smith Water Products Company Service Handbook
Irving, Texas 2000©
Training Department
28
STEP 11. 24 VAC CHECK –
Each terminal of pressure switch to ground; bottom (B) first then top (T) to ground next.
IF… THEN
blocked inlet (B) to gnd does not have 24 VAC check
blocked inlet (B) to gnd does have 24 VAC continu
blocked inlet (T) to gnd does not have 24 VAC replace
blocked inlet (T) to gnd does have 24 VAC continu
blower prover (B) to gnd does not have 24 VAC check
blower prover (B) to gnd does have 24 VAC continu
blower prover (T) to gnd does not have 24 VAC
o to S
blower prover (T) to gnd does have 24 VAC replace
TROUBLESHOOTING
STEP 11 - 24 VAC CHECK
STEP 12 - 24 VAC CHECK THROUGH PRESS SWITCHES
STEP 12. CONTINUATION OF 24 VAC CHECK THROUGH PRESS SWITCHES
• Tank calling for heat
• Blower on (See Table on Page 32 for Opening/Closing Pressures).
IF... THEN
• check for po
• air tubin
is
• replace swit
blower prover (T) to gnd does have 24 VAC continue.
low gas press (B) to gnd does not have 24 VAC check wire co
low gas press. (B) to gnd does have 24 VAC continue.
• check suppl
• connection t
• replace swit
low gas press (T) to gnd does have 24 VAC continue.
• check wire c
• blower prove
blocked outlet (B) to gnd does have 24 VAC continue.
• check for blo
• check for po
• replace swit
blocked outlet (T) to gnd does have 24 VAC continue to St
blocked outlet (B) to gnd does not have 24 VAC
blocked outlet (T) to gnd does not have 24 VAC
• if BTH 120 o
blower prover (T) to gnd does not have 24 VAC
low gas press (T) to gnd does not have 24 VAC
(BTH 120 and 250 only)