EasyManua.ls Logo

ABB ACS580-01 +C135 Series - Quick Installation Guide Manual

ABB ACS580-01 +C135 Series
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
ACS580-01…+C135, ACH580-01…+C135 and ACQ580-01…+C135 frames R4 and R5 flange mounting kit quick installation guide
4 × M5×20 screw
16 × M6×25 screw
23 × M6 nut
2 × M4 nut
f
h
i
4×M6 nut
6 N·m (4.4 lbf·ft)
Note: First attach the inner sides of
the brackets (1) that touch the drive,
then the outer sides (2).
Note: Attach this end to the
bottom U-bracket to make
sure that the sealing is tight.
4 × M5×20 screw
3 N·m
8×M6 nut
6 N·m (4.4 lbf·ft)
R4 IP21 (UL Type 1)
only
For IP55 (UL Type
12) the plug is
installed at the
factory.
a
ABB parts
Available as option +C135 and separately with ordering codes:
3AXD50000031460 (R4) and 3AXD50000031461 (R5).
e
d
4
1
5
2
3
Note: Wear protective
gloves when working.
a
b
8×M6 nut
6 N·m (4.4 lbf·ft)
b
c
e
e
d
d
g
f
1
2
1
2
f
g
f
g
g
c
Frame R5 onlyFrames R4 and R5
Remove the tightening bracket from
the front of the fan.
Attach the clamp plate.
2 × M4 nut, 1 N·m(0.7 lbf·ft)

Other manuals for ABB ACS580-01 +C135 Series

Related product manuals