EasyManua.ls Logo

ABB ACS880-07CLC

ABB ACS880-07CLC
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start-up and validation test
Contents of this chapter
This chapter describes the start-up, validation test procedure, and validation of the safety
function.
Validation of the safety functions
You must do a validation test to make sure that the safety function operates correctly and
according to the safety requirements.
Competence
The person who does the validation test of the safety function must be a competent person
with expertise and knowledge of the safety function and functional safety, as required by
IEC 61508-1 clause 6. This person must document and sign the test procedures and report.
Validation procedure
You must do the validation test using the checklist given in this manual and the validation
test plan of the complete safety system:
at the initial start-up of the safety function
after changes related to the safety function (wiring, components, safety function -related
parameter settings, etc.)
after maintenance work related to the safety function
at the proof test of the safety function.
The validation test must include at least the following steps:
you must have a validation test plan
you must test all commissioned functions for proper operation, from each operation
location
7
Start-up and validation test 25
12

Table of Contents

Other manuals for ABB ACS880-07CLC

Related product manuals