EasyManuals Logo

ABB OTM C 21D User Manual

ABB OTM C 21D
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
5
AUTOMATIC TRANSFER SWITCH, OTM_C_21D
And the return sequence can be summarized in
the following steps:
The Line 1 will start the normal functioning
Return delay TBs
Change-over switch (Switch II) to the position 0
Change-over switch (Switch I) to the position I
Generator stop delay Gs
Generator stop
Figure 2. Automatic Switching Sequences in OTM_C_21D, Line 1 priority
The transfer sequence of OTM_C21D can be sum-
marized in following steps:
An anomaly occurs on the Line 1 (LN1)
Generator start, immediately start generator in
case of black-out, phase-loss, overvoltage or
undervoltage (If Generator mode is selected)
The Line 2 start the normal functioning,
transfer delay Ts
Change-over switch (Switch I) to the position 0
Change-over switch (Switch II) to the position II
2.2 OTM_C21D switching sequence
2.2.1 Line 1 Priority (default mode)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB OTM C 21D and is the answer not in the manual?

ABB OTM C 21D Specifications

General IconGeneral
BrandABB
ModelOTM C 21D
CategorySwitch
LanguageEnglish

Related product manuals