The directory where Update Manager downloads all the packages can be defined in
the Settings view. Note that the connectivity packages are still installed on the
Program Files directory on the same drive where Windows is installed. The installer
needs to be run manually, if the connectivity packages need to be installed on some
other directory.
3.4 Activating connectivity packages
The latest connectivity package is activated automatically by default. If wanted, older
connectivity packages can also be activated in Update Manager. It is recommended to
use the latest version of the connectivity package. The latest PCM600 and
connectivity packages are backward compatible with older IED versions.
1. On the taskbar, click the Start button, and point to All Programs, point to ABB,
and then click Update Manager.
2. Select Manage Connectivity Packages from the left navigation bar.
3. Under the tool version to be configured, select the connectivity package version
to be used and click Close.
4. Restart PCM600.
Restart is required to initialize the activated connectivity packages.
3.5 Downloading IED preconfigurations and
documentation
Preconfigurations are available for some of the IED series. For downloading the
preconfigurations, see the IED-specific documentation. The preconfiguration .pcmi
files are available on the connectivity package DVD under the user documentation
folder, or the files can be downloaded by using the Update Manager.
Enabling preconfiguration and documentation downloading can be done on the
Settings view of Update Manager.
1. On the taskbar, click the Start button, and point to All Programs, point to ABB,
and then click Update Manager.
2. Click Settings in the left navigation bar.
3. Check the documentation and preconfiguration options.
Available documentation and preconfiguration packages are now available on
Software Updates view.
4. To view the documentation for the IED, right-click the IED in Plant Structure
and point to Documentation. Select the needed document from the list.
Section 3 1MRS757866 C
Getting started
14 PCM600
Getting Started Guide