This document is a product manual for ABB PVS-100/120-TL solar inverters, specifically the "B version" models with power outputs ranging from 100 to 120 kW. It provides essential information for qualified technicians regarding the installation, operation, and maintenance of the equipment.
The PVS-100/120-TL is a string inverter designed to convert direct current (DC) supplied by a photovoltaic (PV) generator into alternating current (AC) suitable for feeding into a public distribution grid. It features a two-box configuration, separating the power module from the wiring box, and is a transformerless inverter, which contributes to its high conversion efficiency. The internal circuitry uses a double-stage conversion process, consisting of a DC/DC input converter (booster) and a DC-AC output inverter, both operating at high switching frequencies. The inverter is controlled by two independent Digital Signal Processors (DSPs) and a central microprocessor for operation and protection management.
Important Technical Specifications:
-
Input Side:
- Absolute maximum DC input voltage: 1000 V
- Start-up DC input voltage: 420 V (400 - 500 V)
- Operating DC input voltage range: 360 - 1000 V
- Rated DC input power: 102000 W (PVS-100-TL) / 123000 W (PVS-120-TL)
- Number of independent MPPTs: 6
- MPPT input DC voltage range at Pacr: 480 - 850 Vdc (PVS-100-TL) / 570 - 850 Vdc (PVS-120-TL)
- Maximum DC input power for each MPPT: 17500 W (PVS-100-TL) / 20500 W (PVS-120-TL)
- Maximum DC input current for each MPPT: 36 A
- Maximum input short circuit current for each MPPT: 50 A
- Number of DC input connection pairs for each MPPT: 4
- DC connection type: PV quick fit connector
- Input overvoltage protection: Type II with monitoring (SX/SX2) or Type I+II with monitoring (SY/SY2)
- Fuse rating (versions with fuses): 15 A (gPV/1000 Vdc)
- String current monitoring: Individual string current monitoring (SX2, SY2) or input current monitoring per MPPT (SX, SY)
-
Output Side:
- AC grid connection type: Three phase 3W+PE or 4W+PE
- Rated AC power (Pacr @cosφ=1): 100 000 W (PVS-100-TL) / 120 000 W (PVS-120-TL)
- Rated AC grid voltage: 400 V (PVS-100-TL) / 480 V (PVS-120-TL)
- AC voltage range: 320...480 V (PVS-100-TL) / 384...576 V (PVS-120-TL)
- Maximum AC output current: 145 A
- Output Frequency Range: 45...55 Hz / 55…65 Hz
- Nominal power factor and adjustable range: > 0.995, adj. ± 0 - 1
- Total current harmonic distortion: <3%
- Maximum AC cable: 185 mm² copper/aluminum
- Output overvoltage protection: Modular surge arresters Type 2 with monitoring
-
Operating Performance:
- Maximum Efficiency (ηmax): 98.4% (PVS-100-TL) / 98.9% (PVS-120-TL)
- Weighted Efficiency (EURO): 98.2% (PVS-100-TL) / 98.6% (PVS-120-TL)
-
Environmental:
- Ambient temperature range: -25...+60°C
- Storage temperature: -40°C...+85°C
- Relative Humidity: 4…100 % with condensation
- Environmental Protection Rating: IP 66 (IP54 for the cooling section)
- Cooling: Forced air
- Maximum operating altitude without derating: 2000 m
-
Physical:
- Dimensions (H x W x D): 867x1086x419 mm (SX, SY) / 867x1086x458 mm (SX2, SY2)
- Weight: ~125 kg / 276 lbs (overall max)
- Mounting system: Mounting bracket vertical & horizontal support
Usage Features:
- Flexible Installation: Supports both vertical and horizontal installation, with specific guidelines for tilting and clearance distances to ensure proper ventilation and prevent overheating.
- Communication Interfaces: Equipped with WLAN (IEEE802.11 b/g/n @ 2.4 GHz), 2x Ethernet (RJ45) ports, and 1x RS485 port.
- User Interface: Features 4 LEDs for status indication, a Web User Interface, and a Mobile APP (ABB Installer for Solar Inverters) for commissioning and parameter settings.
- Remote Monitoring: Integrated logging capability allows remote monitoring and asset management via the Aurora Vision® Plant Management Platform (cloud-based).
- Power Limitation (Derating): The inverter automatically reduces power output under adverse environmental conditions (thermal derating), high/low input voltage, grid over/under frequency/voltage, or user-defined output power percentage to ensure safe operation.
- Safety Devices: Includes Anti-Islanding protection, ground fault detection for PV panels, string fuses (optional, for positive and/or negative poles depending on model), and overvoltage surge arresters (Type II for AC and DC, or Type I+II for AC and DC with replaceable cartridges depending on model).
- Reactive Power Control: Capable of producing reactive power and feeding it into the grid via power factor settings.
- Active Power Limiting: Allows limiting the active power fed into the grid to a desired, settable value.
- Remote Switch-on/Switch-off: Can be controlled externally via a remote command, with functionality enabled through the web user interface.
- Configurable Relays: Equipped with 2 multifunction relays for configurable activation (e.g., alarms).
- Demand Response Mode 0 (DRM0): Supports DRM0 functionality via the Remote terminal block, as per AS/NZS 4777.2 standard.
Maintenance Features:
- Routine Maintenance: Includes annual visual inspections (checking for alarms, label visibility, cable integrity, environmental conditions, obstacles in cooling), annual operations (tightening cable glands, checking front covers, monitoring alarms/errors, operating AC disconnect switch), and annual cleaning (equipment, cooling fan assembly, heat sink).
- Troubleshooting: The manual provides a comprehensive table of alarm messages (error codes, descriptions, LED status) and corresponding solutions for common issues, including those related to wireless communication.
- Component Replacement Procedures: Detailed instructions are provided for replacing various components, including:
- Cooling section
- Internal fan section
- DC surge arrester boards (for -SX/SX2 models)
- AC surge arrester cartridges (for -SX/SX2 models)
- Memory board
- COMM RS485 board
- Buffer battery
- Inverter Total De-energization and Safe Access Procedure: A critical procedure outlining steps to safely de-energize the inverter and access internal active parts, including preliminary checks, operations on external AC/DC switches, internal AC/DC disconnect switches, removal of DC cables, capacitor discharge, voltage absence tests (on DC side, AC side, and DC bulk capacitor), and grounding kit installation on the AC side. This procedure emphasizes the use of appropriate Personal Protective Equipment (PPE) and is intended for skilled or trained personnel.
- Ground Leakage Verification: Instructions on how to measure the isolation resistance of the PV generator to detect ground leakages.
- Firmware Update: Firmware can be updated remotely via Aurora Vision® or locally via the Web User Interface or ABB Installer for Solar Inverters APP.
- Security Token for Admin Plus Privileges: A procedure to obtain a security token for accessing advanced "Admin Plus" settings on the web user interface, which allows modification of sensitive parameters.