EasyManua.ls Logo

ABB REC670 2.1 IEC - Page 56

ABB REC670 2.1 IEC
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Voltage protection
M13290-1 v14
Table 44. Two step undervoltage protection UV2PTUV
Function Range or value Accuracy
Operate voltage, low and high step (1.0–100.0)% of
UBase
±0.5% of U
r
Absolute hysteresis (0.0–50.0)% of
UBase
±0.5% of U
r
Internal blocking level, step 1 and step 2 (1–50)% of
UBase
±0.5% of U
r
Inverse time characteristics for step 1 and step 2, see table 147 - See table 147
Definite time delay, step 1 at 1.2 to 0 x U
set
(0.00-6000.00) s ±0.2% or ±40ms whichever is
greater
Definite time delay, step 2 at 1.2 to 0 x U
set
(0.000-60.000) s ±0.2% or ±40ms whichever is
greater
Minimum operate time, inverse characteristics (0.000–60.000) s ±0.5% or ±40ms whichever is
greater
Operate time, start at 2 to 0 x U
set
Min. = 15 ms
Max. = 30 ms
-
Reset time, start at 0 to 2 x U
set
Min. = 15 ms
Max. = 30 ms
-
Operate time, start at 1.2 to 0 x U
set
Min. = 5 ms
Max. = 25 ms
-
Reset time, start at 0 to 1.2 x U
set
Min. = 15 ms
Max. = 35 ms
-
Critical impulse time 5 ms typically at 1.2 to 0 x U
set
-
Impulse margin time 15 ms typically -
1MRK 511 361-BEN B
Bay control REC670 2.1 IEC
Product version: 2.1
56 ABB

Related product manuals