EasyManua.ls Logo

ABB REL 551 2.3 Series - Introduction to the Installation and Commissioning Manual

ABB REL 551 2.3 Series
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Introduction to the installation and
commissioning manual
&KDSWHU
,QWURGXFWLRQ
 $ERXWWKHLQVWDOODWLRQDQGFRPPLVVLRQLQJPDQXDO
The installation and commissioning manual contains the following chapters:
The chapter ³6DIHW\LQIRUPDWLRQ´ presents warning and note signs, which the user
should pay attention to.
The chapter ³2YHUYLHZ´ gives an overview over the major tasks when installing
and commissioning the terminal.
The chapter ³8QSDFNLQJDQGFKHFNLQJWKHWHUPLQDO´ contains instructions on how
to receive the terminal.
The chapter ³,QVWDOOLQJWKHWHUPLQDO´ contains instructions on how to install the ter-
minal.
The chapter ³&KHFNLQJWKHH[WHUQDOFLUFXLWU\´ contains instructions on how to
check that the terminal is properly connected to the protection system.
The chapter ³(QHUJLVLQJWKHWHUPLQDO´ contains instructions on how to start-up the
terminal.
The chapter ³&RQILJXULQJWKHGLJLWDOFRPPXQLFDWLRQPRGXOHV´ contains instruc-
tions on how to configure the communication modules such as modems, optical
converters etc if included in the terminal.
The chapter ³6HWWLQJDQGFRQILJXULQJWKHWHUPLQDO´ contains instructions on how to
download settings and configuration to the terminal.
The chapter ³(VWDEOLVKLQJFRQQHFWLRQDQGYHULI\LQJWKH63$,(&FRPPXQLFDWLRQ´
contains instructions on how to enter SPA/IEC settings and verifying the SPA/IEC
communication.
The chapter ³9HULI\LQJVHWWLQJVE\VHFRQGDU\LQMHFWLRQ´ contains instructions on
how to verify that each included function operates correctly according to the set val-
ues.
The chapter ³9HULI\LQJWKHLQWHUQDOFRQILJXUDWLRQ´ contains instructions on how
verify that the terminal is properly configured.
The chapter ³7HVWLQJWKHSURWHFWLRQV\VWHP´ contains instructions on how to test
that the terminal is in contact with the primary system.
The chapter ³&KHFNLQJWKHGLUHFWLRQDOLW\´ contains instructions on how to test di-
rectional dependent functions, if included in the terminal.
 ,QWHQGHGDXGLHQFH
 *HQHUDO
The installation and commissioning manual is addressing the installation, commission-
ing and maintenance personnel responsible for taking the protection into normal service
and out of service.

Related product manuals