EasyManua.ls Logo

ABB SACE Emax 2 Series - Disassembly Operations for Circuit Breakers E1.2

ABB SACE Emax 2 Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB | SACE Emax 2
Accessories | 1 - Preliminary considerations29 | © 2018 ABB | 1SDH001316R0002 - ECN000086018 - Rev. C
Disassembly operations for
circuit breakers E1.2
To dismantle the accessories, the following parts must be removed from the circuit-breaker:
Front cover (A) and protection (F) by removing the screws (B and C).
For 4-p circuit-breakers, the lateral protection (D) by fixing the screws (C and E).
A
D
C
E
B
F
Figure 7 - Removing the front cover and protections
After reassembling the accessories, the parts previously dismantled must be reassembled as indicated:
Front cover (A) and protection (F) by screwing the fixing screws (B and C) with tightening torque 0.8 Nm
- 7 lb in (B) and 1.5 Nm - 13 lb in (C).
For 4-p circuit-breakers, the lateral protection (D) by fixing the screws (C and E) with tightening torque
1.5 Nm - 13 lb in.
A
D
B
C
E
F
Figure 8 - Assembly of front cover and protections

Table of Contents

Other manuals for ABB SACE Emax 2 Series

Related product manuals