REGOLAZIONE:
N.B. Nelle regolazioni quando si agisce sui dadi non far ruotare su sé stessi i puntali dei cavi
1 Inserire le parti mobili nelle parti fisse (se estraibili) e sganciare la molla
2 Chiudere l’interruttore ‘‘CB1’
3.1 Tirare il cavo ‘‘Y2’’ dell’interruttore chiuso verso il basso fino a portare il tirante ‘‘Y4’’ dell’interruttore aperto in battuta sul piano ‘‘Y3’
3.2 Bloccare il grano ‘‘Y1’’ (1,5 Nm / 13.3 lb in) e chiudere il relativo controdado ‘‘Y5’’ (1.5 Nm / 13.3 lb in)
4 Aprire l’interruttore ‘‘CB1’
5 Chiudere l’interruttore ‘‘CB2’’ e ripetere i punti 3.1 e 3.2
6 Aprire l’interruttore ‘‘CB2’
7 Eseguire alcune manovre di chiusura e apertura, quindi verificare la battuta dei tiranti ‘‘Y4’’ sul piano ‘‘Y3’
8 Aprire l’interruttore chiuso e riagganciare la molla
9 Chiudere l’interruttore ‘‘CB1’’ e caricare le molle di chiusura dell’interruttore ‘‘CB2’
10 Muovere in direzione verticale la slitta ‘‘Y8’’ dell’interruttore ‘‘CB2’’ fino a portare il segnalatore ‘‘Y6’’ centrato nella finestra . Se necessario, è possibile
modificare la quota 22 (0.86") agendo sui dadi ‘‘Y7’’ rispettando i valori min. e max. indicati
11 Ribloccare i dadi ‘‘Y7’’ (3 Nm / 26.5 lb-in)
12 Aprire l’interruttore ‘‘CB1’’ e caricare le molle
13 Chiudere l’interruttore ‘‘CB2’’ e ripetere i punti 2 e 3
14 Aprire l’interruttore ‘‘CB2’’. Chiudere e riaprire gli interruttori ‘‘CB1’’ e ‘‘CB2’’ per scaricare le molle
15 Eseguire alcune manovre di chiusura e apertura, quindi verificare la battuta dei tiranti ‘‘Y4’’ sul piano ‘‘Y3’
ADJUSTMENT:
N.B. During adjustments, when tightening or loosening the nuts do not allow the tips of the cables to rotate on themselves
1 Fit moving parts into fixed parts (if withdrawable) and release the spring
2 Close circuit-breaker ‘‘CB1’
3.1 Pull cable ‘‘Y2’’ of the closed circuit-breaker downwards until the tie rod ‘‘Y4’’ of the open circuit-breaker touches the surface ‘‘Y3’
3.2 Lock the grub screw M4 ‘‘Y1’’ (1.5 Nm / 13.3 lb in) and close the corresponding lock nut (1.5 Nm / 13.3 lb in)
4 Open circuit-breaker ‘‘CB1’
5 Close circuit-breaker ‘‘CB2’’ and repeat steps 3.1 e 3.2
6 Open circuit breaker ‘‘CB2’
7 Perform a few opening and closing operations, than check that the tie rods ‘‘Y4’’ are touching against the surface ‘‘Y3’
8 Open closed circuit-breaker and hook up the spring again
9 Close circuit-breaker ‘‘CB1’’ and charge circuit-breaker ‘‘CB2’’ closing springs
10 Move slide ‘‘Y8’’ of the circuit-breaker ‘‘CB2’’ in vertical direction until the indicator ‘‘Y6’’ is centered in the window. If necessary, it is possible to adjust
dimension 22 (0.86") operating on nuts ‘‘Y7’’ within the min. and max. values shown
11 Lock nuts ‘‘Y7’’ (3Nm / 26,5 lb-in)
12 Open circuit-breaker ‘‘CB1’’ and charge the springs
13 Close circuit-breaker ‘‘CB2’’ and repeat steps 2 and 3
14 Open circuit breaker ‘‘CB2’’. Close and re-open breakers ‘‘CB1’’ and ‘‘CB2’’ to discharge the springs.
15 Perform a few opening and closing operations, than check that the tie rods ‘‘Y4’’ are touching against the surface ‘‘Y3’