EasyManuals Logo
Home>ABB>Industrial Equipment>TPL-C Series

ABB TPL-C Series User Manual

ABB TPL-C Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #51 background imageLoading...
Page #51 background image
Operation Manual / TPL67-C.. - TPL71-C..
Operation
4
Speed measurement
4.4
Page 49
© Copyright 2016 ABB. All ri
ghts reserved.
April 2016 HZTL2488_EN Revision C
Replacing the speed sensor
WARNING
Hot cable connector and hot speed sensor
Risk of burning. During operation, the cable connector and the speed
sensor can reach temperatures exceeding 100 °C.
Wear safety gloves when removing the cable connector and speed
sensor.
Wear safety gloves against thermal risks.
Reduce engine performance to the idling speed, then stop the engine.
Switch off the lubricating oil supply to the turbocharger.
Disconnect the cable connector from the speed sensor.
Screw out defective speed sensor.
Screw in a new speed sensor up to the limit block.
Observe the tightening torque (see the table of tightening torques in
the chapter entitled Disassembly and assembly).
NOTICE
Sealing the speed sensor
The speed sensor is designed with a sealing lip and does not require an
additional gasket when fitted.
Connect cable connector to speed sensor.
Switch on lubricating oil supply to turbocharger.
Failure of speed measuring system
Possible reasons for failure of the speed measuring system are described
in the chapter Troubleshooting.
4.4.3
4.4.4

Table of Contents

Other manuals for ABB TPL-C Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL-C Series and is the answer not in the manual?

ABB TPL-C Series Specifications

General IconGeneral
BrandABB
ModelTPL-C Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals