EasyManuals Logo
Home>ABB>Industrial Equipment>TPL-C Series

ABB TPL-C Series User Manual

ABB TPL-C Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Operation Manual / TPL67-C.. - TPL71-C..
Maintenance
5
Cleaning the compressor during
operation
5.3
Page 59
© Copyri
ght 2016 ABB. All rights reserved.
April 2016 HZTL2488_EN Revision C
Wet cleaning using external water-pressure vessel (XC3)
Operating state prerequisites for wet cleaning XC3
In the case of V-engines with several turbochargers on each engine, it is
recommended that both turbochargers are cleaned in parallel. This clean-
ing process is faster and the risk of turbocharger surging is reduced.
Compressor wet cleaning procedure with XC3
It is mandatory to fulfil the operating condition prerequisites before
cleaning compressors with XC3.
Remove the sealing plug (X).
Fill the vessel with the required volume of clean water (see the
Table
of cleaning parameters
).
Screw in the sealing plug (X).
Push the valve activator (Y) against the spring and hold it for 10 to 15
seconds until the entire volume of water has been injected.
After cleaning, wait at least 5 minutes to allow the turbocharger to dry.
5.3.2
Operating the water pres-
sure vessel

Table of Contents

Other manuals for ABB TPL-C Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL-C Series and is the answer not in the manual?

ABB TPL-C Series Specifications

General IconGeneral
BrandABB
ModelTPL-C Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals