5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2018 . All rights reserved. HZTL2481_EN Revision C May 2018
5.3.2 Wet cleaning using external water-pressure vessel
(XC3)
Operating state prerequisites for wet cleaning XC3
NOTICE
To be able to carry out a satisfactory cleaning process which has been
tested and is recommended by ABB Turbo Systems, the following pre-
requisites must be fulfilled:
ü Engine load 50 ... 85%
u Start of cleaning cycle in accordance with following description for
wet cleaning operation with XC3.
Operating procedure for compressor wet cleaning with XC3
Operating the water pres-
sure vessel
u The operating state prerequisites for compressor cleaning with XC3
must be fulfilled.
u Remove sealing plug (X).
u Fill vessel with required volume of clean water (see table Cleaning
parameters).
u Screw in sealing plug (X).
Page 54 / 136

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL69-A30 and is the answer not in the manual?

ABB TPL69-A30 Specifications

General IconGeneral
BrandABB
ModelTPL69-A30
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals