Operation Manual / TPS48-D/E.. - TPS61-D/E..
P
reliminary remarks
1
Storage of new turbochargers and
spare parts
1.4
Page 9
April 2015 HZTL2410_EN Revision D
NOTICE
Replacement components ready for operation
If the 70% display field of the hygrometer (2) has not changed colour
and the package is undamaged, the replacement turbocharger or
replacement cartridge group can be placed into operation without any
prior testing by an ABB Turbocharging Service Station.
The corrosion protection effect ends after the material is unpacked from
the VCI package.
To avoid the formation of condensation, the surroundings and the content
of the package must have the same temperature during unpacking.
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPS61-D Series and is the answer not in the manual?

ABB TPS61-D Series Specifications

General IconGeneral
BrandABB
ModelTPS61-D Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals