Operation Manual / TPS48-D/E.. - TPS61-D/E..
P
reliminary remarks
1
Turbocharger rating plate
1.7
Page 15
April 2015 HZTL2410_EN Revision D
The recommended replacement intervals and the corresponding
operational limits are jointly defined with the engine manufacturer. This
information is specific to the system.
Operation above the indicated values n
Bmax
, t
Bmax
can considerably shorten the
recommended replacement intervals. In such cases, we recommend that you
contact the nearest official ABB Turbocharging service station.
n
Mmax
and t
Mmax
normally apply only when running at overload (110%) during
trials on the engine test bed. These limits can also be permitted during operation
for special applications. Operation above n
Mmax
and t
Mmax
is not permitted.
Non-observance of the recommended replacement intervals can increase the
risk of unpredictable component failures.
A rating plate (1) is attached to the left and right-hand sides of the
turbocharger bearing casing.
1.7.1
1.7.2
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPS61-D Series and is the answer not in the manual?

ABB TPS61-D Series Specifications

General IconGeneral
BrandABB
ModelTPS61-D Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals