EasyManua.ls Logo

ABB TPS61-D Series - Page 64

ABB TPS61-D Series
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPS48-D/E.. - TPS61-D/E..
Maintenance
5
Tu
rbine cleaning during operation
5.3
Page 62
April 2015 HZTL2410_EN Revision D
The cleaning process with short water injection time is used for
turbocharger designs without additional sealing by means of C-rings.
The process is based on the principle of thermal shock in combination
with a subsequent flushing phase.
The cleaning process with a long water injection time is used for
turbocharger designs with additional sealing by means of C-rings.
Based on a 10-minute injection phase, this cleaning process utilises the
water solubility of the dirty deposits.
NOTICE
Choice of cleaning method
If you need information about the choice of cleaning method (short /
long), you can contact the engine builder or an official ABB
Turbocharger service station.
5.3.1
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Related product manuals