Turbine cleaning during operation
5.3
Page 64
April 2015 HZTL2410_EN Revision D
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
Conditions
short
water injection time
long
water injection time
Engine load (guide value) 2040 %
Turbine inlet temperature
T
TE
before water injection
350 - 400 °C 350 - 430 °C
Water supply ensured
Water pressure
(overpressure over
atmosphere) p
WT
2.0 bar 1.5 bar
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.