25
NOTE
Do not remove ceiling frame in the case of functional
units with roof applications and SBR units
3.5.4 Assembling the remaining switchgear units
3.5.5 Switchgear fastening to the floor
Floor preparation
Figure 47. Places for screws
Figure 49. Screw positions for WBC – WBS units
Figure 48. Screw positions