DISTRIBUTION SOLUTIONS
25
NOTE
Do not remove ceiling frame in the case of functional
units with roof applications and SBR units


3.5.4 Assembling the remaining switchgear units





 

3.5.5 Switchgear fastening to the floor
Floor preparation

















Figure 47. Places for screws
Figure 49. Screw positions for WBC – WBS units
Figure 48. Screw positions