EasyManua.ls Logo

Abus TVCC80000 - Page 36

Abus TVCC80000
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
English
2.10 Installing the Speed Dome in the mounting plate
2.10.1 Lay the cables for the Speed Dome and align the bottom side of the Speed Dome with
the mounting plate as shown in the diagram.
2.10.2 Push the Speed Dome upwards and then to the front in the direction of the arrow. As
soon as the Speed Dome is in the correct position, the spring automatically engages in
the mounting plate.
To complete installation, remove the protective film from the dome.
Screw holes
Cable guide hole
Alignment
Push to the front
Push upwards
Locking
mechanism
Spring
1
2

Other manuals for Abus TVCC80000

Related product manuals