EasyManua.ls Logo

Acer AO756 - Page 145

Acer AO756
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service and Maintenance 5-50
3. With mainboard connector clips flipped up, connect the LED board cable connector to the
mainboard connector, then flip the clips down to lock.
Figure 5:67. Connecting the LED Board Cable
4. Install the upper case (see Upper Case Installation on page 5-36).
Table 5:15. LED Board Screw
Screw Name Screw Type Quantity
M 2.0 x 3.0 1

Table of Contents

Related product manuals