EasyManua.ls Logo

Acer G205H - Page 21

Acer G205H
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 21 -
5
Tear down the two tape
behind the FFC and fix
the FFC of C/B to panel
The FFC must be
affixed besides the
under edge of the
panel
6
Assemble the SPK to the
main-SHD, the correct
position reference on the
picture, then the lock 4
screws to fasten it.
Screw-driver
7
Assemble the LVDS to the
I/F, the correct position
reference on the picture
Without the gap within
NOTE: Circuit boards >10 cm² has been highlighted with the yellow rectangle as
above image shows. Please detach the Circuit boards and follow local regulations for
disposal.
8
Assemble the PCBA to
Main-SHD

Other manuals for Acer G205H

Related product manuals