Installation and Commissioning Guide
Split Ducted Outdoor Units
Installation and Commissioning Guide - Standard Commercial Split Ducted Commercial Outdoor Unit
Doc. No.0525-056 Ver. 7 220308
15
îî. Outdoor Unit Preparation
ACCESS
PANEL
MOUNTING
SCREWS
Step 1: Remove mounting screws, as shown:
Step 2: Remove Access Panel.
A
Removal Order:
Pull-Out 20mm
Pull-Down to remove
Access Panel-Electrical
A
B
B
THIRD ANGLE
PROJECTION
7.
BY
0525-0XX Install Guide Commercial Split V1 - Page 21 - 3
D
E
F
C
B
A
321 5
C
D
4 6 7 8
A
B
0525-0XX Install Guide Commercial Split V1 - Page 21 - 3
A3
SHEET 1 OF 1
N.T.S
DRAWING NO.
MATERIAL:
DESCRIPTION:
DATE
DRAWN BY: APPROVED BY: SCALE:DRAWN DATE:
DESCRIPTION
FINISH:
REV
PCR
F
3
intellectual property of Actron
PH. +61 2 8814 4000
A.B.N. 34 002 767 240
REV.
2.
1
ActronAir Pty Ltd This drawing always remains the
1.
HOLE DIAMETER 0.1/ ~0
E
0.5 / m
written consent is prohibited
ANGLES & SQUARENESS
FLAT PATTERN
Norwest Business Park
5.
4.
0.5 / m3.
FOLD
5 Irvine Place
Bella Vista NSW 2153 Modifying or Distributing without
Engineering Pty Ltd. Copying,
GENERAL TOLERANCES
(UNLESS OTHERWISE SPECIFIED)
ALL TUBES
UNLESS OTHERWISE SPECIFIED
3rd ANGLE PROJEC TION.1.
DIMENSIONS IN MILLIMETRES.2.
DO NOT SCAL E.3.
TUBE ENDS MUST BE RO UND AND OF FULL 4.
DIAMETER.
TUBE MUST BE CLEAN AND FREE FRO M 5.
BURRS INSIDE AND O UTSIDE AND SUITABLE
OF FOR SOLDERING.
ALL BENDS 90 .6.
ALL SHEETMETAL'S DIMENSIONS OUTISDE.
ASSEMBLY
REMOVE
ACCESS
PANEL