Installation and Commissioning Guide
Split Ducted Outdoor Units
Installation and Commissioning Guide - Standard Commercial Split Ducted Commercial Outdoor Unit
Doc. No.0525-056 Ver. 7 220308
33
OUTDOOR UNIT
Parts
Service Period
Detail of Service Check Service Methods
1
Mth
3
Mth
6
Mth
1
Yr
2
Yrs
3
Yrs
4
Yrs
5
Yrs
Safety
Devices
Check calibration of safety
devices such as HP and LP
controls, sensors, etc
Check resistance of sensors,
pressure cut in / cut out of
pressure controls
Faults
Check for any previous fault
history on unit.
Investigate any causes for
previous faults, reset fault
history.
Outdoor Fan
Speed Capacitor
Check for any bulge on the
capacitors & capacitance.
Make it electrically safe prior to
measure the capacitor
capacitance.
Measured capacitance should be
with in the printed tolerances
on the
capacitor.