EasyManua.ls Logo

ADLINK Technology DLAP-301 Series - 2 Getting Started; Unpacking Checklist; Cooling Considerations

ADLINK Technology DLAP-301 Series
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Getting Started 17
DLAP-301 Series
2 Getting Started
2.1 Unpacking Checklist
Before unpacking, check the shipping carton for any damage. If
the shipping carton and/or contents are damaged, inform your
dealer immediately. Retain the shipping carton and packing
materials for inspection. Obtain authorization from your dealer
before returning any product to ADLINK. Ensure that the fol-
lowing items are included in the package.
X DLAP-301 unit
X Screw pack
X Terminal block for DC input
X Remote power control cable
X Wall mount kit (plus optional DIN rail kit if applicable)
2.2 Cooling Considerations
All heat-generating components of the DLAP-301 are located on
the top side of the system. These components directly contact the
heat sink via thermal pads to dissipate heat. To maximize effi-
ciency of heat dissipation, maintain a minimum of 2 inches (5cm)
clearance from the top of the DLAP-301.

Table of Contents

Related product manuals