ITC8113 / TabX® 19
© ads-tec Industrial IT GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany
4 Commissioning
The power supply connection and the interfaces on the device are located on the side of the
housing. All supply leads and all required data leads have to be connected before
commissioning.
The device must be switched off before connecting or disconnecting any
cables in order to prevent damage to the electronics!
The device may only be switched on after acclimatising to the ambient
temperature in order to avoid condensate accumulation. Make sure to meet
the permissible voltage for this device.
After switching off and before switching on you must wait for at least 5
seconds.
The shielding of a data cable must always be connected with the connector
housing (EMC).
For embedded operating systems, the interfaces must be explicitly
enabled and the necessary drivers installed in order to use them.
When using accessories, proceed according to chapter Accessories.
4.1 Procedure
/Datentechni k/Inbetriebnahme/Reihenfolge der Inbetriebnahme/Reihenfolge der Inbetriebnahme für VMT 60xx- Seri e @ 1\mod_1222073159179_6.doc @ 4100 @
Pos: 19 /Datent ech nik/I nbetri ebnah me/Be trieb sberei tsch aft prüf en/ Betri ebsber eitsc haft pr üfen für OPC/CPC /PLC/OT C/ITC /VMT- Seri e(+M onitor e) / IPC 5 100/55 00/24 00/1 100 @ 0\mod_1158905578361_6.doc @ 381 @
No. Description
Check for operational readiness
1 Check the battery charge state
(see chapter Battery operation)
2 Insert battery into the device and snap into place
(see chapter Battery operation)
3 Connect power adapter (if necessary)
4
Start the device (ON/OFF pushbutton) and activate
in the operating system by entering the licence
information