EasyManuals Logo

Advent Roof Top User Manual

Advent Roof Top
13 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
5
C. POST LOCATION SELECTION:
1. Check for obstructions in the area where air conditioner will be installed.
2. The roof must be capable of supporting 130lbs while the RV is in motion.
Normally, a 200 lb. static load design will meet this requirement.
3. ROOF PREPARATION
A. EXISTING ROOF VENT REMOVAL:
1. Unscrew and remove the roof vent.
2. Remove all caulking compound around opening.
3. Seal all screw holes and seams where the roof gasket will be located. Use a good
grade of all weather sealant.
B. NEW OPENING:
1. A 14-1/4" x 14-1/4"±1/8” opening must be cut through the roof and ceiling of the RV. It
is recommended this opening be located between roof framework.
2. Mark a 14-1/4" x 14-1/4" square on the roof and carefully cut the opening.
3. Using the roof opening as a guide, cut the matching hole in the ceiling. See FIG.4.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Advent Roof Top and is the answer not in the manual?

Advent Roof Top Specifications

General IconGeneral
BrandAdvent
ModelRoof Top
CategoryAir Conditioner
LanguageEnglish

Related product manuals