C. POST LOCATION SELECTION: 
 
1.  Check for obstructions in the area where air conditioner will be installed. 
2.  The roof must be capable of supporting 130lbs while the RV is in motion. 
Normally, a 200 lb. static load design will meet this requirement. 
 
 
3. ROOF PREPARATION 
   
 
A. EXISTING ROOF VENT REMOVAL: 
1.  Unscrew and remove the roof vent. 
2.  Remove all caulking compound around opening. 
3.  Seal all screw holes and seams where the roof gasket will be located. Use a good 
grade of all weather sealant. 
 
B. NEW OPENING: 
1.  A 14-1/4" x 14-1/4"±1/8” opening must be cut through the roof and ceiling of the RV. It 
is recommended this opening be located between roof framework. 
2.  Mark a 14-1/4" x 14-1/4" square on the roof and carefully cut the opening. 
3.  Using the roof opening as a guide, cut the matching hole in the ceiling. See FIG.4.