EasyManua.ls Logo

AES EFI Series - Winter Shutdown;Lay-Up

AES EFI Series
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
Winter Shutdown/Lay-up
If there is a chance of frost after the swimming season has ended when the swimming pool heating is
switched off and the external temperature is expected to drop below the operating limit, the water
circuit of the heat pump should be completely drained. Otherwise, suitable constructional measures should
be taken by the customer to protect the heat pump against damage from frost.
Attention: The warranty does not cover damage caused by inadequate lay-up measures during the
winter.