Commissioning
25
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
Mounting location is meet the requirements.
All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
• The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
Turn on the AC switch between inverter output and the public grid;
Turn on the DC switch on the inverter;
Turn on the PV switch of the system.
• Turn off the DC switch on the inverter.
• Turn off the DC switch between PV panels and the inverter (if any).
• Close the AC switch between the inverter and the public grid.
6. Commissioning
7. Start-up & Shut Down
• Shut down the inverter according to Chapter 7.1.
• Start-up the inverter according to Chapter 6.
7.2 Restart
7.1 Shut down
Note:
The inverter will be operable after minimum 5 minutes.