Commissioning
25
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
• Mounting location is meet the requirements.
• All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
• The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
• Turn on the AC switch between inverter output and the public grid;
• Turn on the DC switch on the inverter;
• Turn on the PV switch of the system.
• Turn off the DC switch on the inverter.
• Turn off the DC switch between PV panels and the inverter (if any).
• Close the AC switch between the inverter and the public grid.
6. Commissioning
7. Start-up & Shut Down
• Shut down the inverter according to Chapter 7.1.
• Start-up the inverter according to Chapter 6.
7.2 Restart
7.1 Shut down
Note:
The inverter will be operable after minimum 5 minutes.