EasyManua.ls Logo

AGFA DX-D - Preparation

AGFA DX-D
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation
Figure 8: Prep
Press the handswitch halfway (“Prep” position) to prepare the X-ray tube for
exposure. The indicator will light up when the X-ray tube is prepared and
there are no interlock failures or system faults.
After pressing this push-button, the following functions are activated:
Anode rotation.
Filament current switches from stand-by to the selected mA.
DX-D Software Console | Operating the DX-D Software Console | 29
0189D EN 20180329 1421

Related product manuals