Issued: 01-05-2012 Revision: 1.0 Copyright 2012 Agilent Technologies
Page 2 of 13
Table of Content
1. Introduction…………………………………………………….3
1.1 General Information…………………………………………………….3
1.2 Meter Information……………………………………………………….3
1.3 Required Materials…………………………………………………….. 3
1.4 Meter Keys……………………………………………………………….5
1.5 Meter connections………………………………………………………5
2. Installation Qualification…………………………………….5
2.1 Overview………………………………………………………………….5
2.2 Meter Information……………………………………………………….6
2.3 Environment Condition………………………………………………..6
2.4 Document Inspect………………………………………………………6
2.5 Component Check……………………………………………………...6
2.6 Reference Standard Information……………………………………..6
3. Operation Qualification……………………………………...6
3.1 Meter Power Supply……………………………………………………7
3.2 Meter Self-Test………………………………………………………….7
3.3 Manual Temperature Verification…………………………………….8
3.4 pH electrode Calibration……………………………………………….8
3.5 ISE electrode Calibration………………………………………………8
3.6 DO Probe Calibration…………………………………………………..8
3.7 Conductivity Probe Calibration………………………………………9
4. Performance Verification…………………………………10
5. Appendix Documents……………………………………….10