EasyManuals Logo
Home>Agilent Technologies>Analytical Instruments>6495B

Agilent Technologies 6495B User Manual

Agilent Technologies 6495B
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
Installation and Verification of Other Sources 4
To install the G1978B multimode source
Agilent 6400 Series Triple Quad LC/MS System Installation Guide 77
c Remove the previously installed spray chamber. Install the multimode
spray shield if not already installed.
d Orient the standard spray shield so the field-shaping electrode is at the
6 o'clock and 9 o’clock positions by loosening the two T10 screws that
secure the end plate, orienting the spray shield, and re-tightening the
two T10 screws (do not over-tighten).
e Install the multimode spray chamber on the spray chamber mount, close
the spray chamber, and fasten the latch. If needed, adjust the latch to
ensure that the O-ring seals completely. Use a ¼-inch × 5/16-inch wrench
to loosen the lock nut, adjust the latch to the proper fit, and then tighten
the lock nut so that the latch maintains its adjustment.
f Connect the multimode high voltage, APCI corona, and vaporizer heater
cables to the connector on the left side panel of the instrument.
g Connect the 1/8-inch nebulizing gas tubing from the LC/MS mainframe
to the nebulizer gas fitting.
h Connect the PEEK tubing from the selection valve (inside the front
cover) to the top of the nebulizer.
WARNING
Surfaces can be extremely hot.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 6495B and is the answer not in the manual?

Agilent Technologies 6495B Specifications

General IconGeneral
BrandAgilent Technologies
Model6495B
CategoryAnalytical Instruments
LanguageEnglish

Related product manuals