Instrument Installation 1
Step 1. Unpack and set up the Triple Quadrupole LC/MS
Agilent 6400 Series Triple Quad LC/MS System Installation Guide 9
Step 1. Unpack and set up the Triple Quadrupole LC/MS
1 Carefully examine all containers for external signs of damage. If damage is
discovered, immediately contact the carrier and the Agilent Service
Management.
Retain shipping containers and material until contents are checked for
completeness and instrument performance is verified.
2 Check off each item on the packing list, and verify the serial numbers.
3 Record the serial numbers in the installation documentation.
4 Report any discrepancies to Agilent Technologies.
5 Check that site preparation is complete, which includes power and gas
supplies and chemical supplies needed for installation and performance
verification.
6 Check the line voltage in the lab.
Verify the proper line voltage and outlet ratings according to the
instructions given in the Site Preparation Guide.
Do not open the shipping containers until an Agilent representative is present to verify the
contents of each carton. Warranty claims for missing items are honored only if an Agilent
representative is on site to verify the contents of each shipping container as it is
unpacked.
Checkout and tuning samples are shipped separately to comply with shipping regulations
and to ensure prompt delivery. Make sure that these samples have been stored correctly,
as indicated in the instructions in the box.