EasyManuals Logo
Home>Agilent Technologies>Analytical Instruments>6495B

Agilent Technologies 6495B User Manual

Agilent Technologies 6495B
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #80 background imageLoading...
Page #80 background image
4 Installation and Verification of Other Sources
To install the G1971B APPI source
80 Agilent 6400 Series Triple Quad LC/MS System Installation Guide
loosen the lock nut, adjust the latch to the proper fit, and then tighten
the lock nut so that the latch maintains its adjustment.
f Connect the vaporizer heater cable to the connector on the left side
panel of the instrument.
g Connect the 1/8-inch nebulizing gas tubing from the LC/MS mainframe
to the nebulizer gas fitting.
h Connect the PEEK tubing from the selection valve (inside the front
cover) to the top of the nebulizer.
Do not use the APPI USB to Serial Converter Cable (p/n 8121- 1013).
3 Connect the APPI power supply cable to the APPI DB9 power connector
and screw it in. This connector contains both serial and power interfaces.
4 Connect the other end of the serial cable to the Serial connector on the
smart card interface, which is located on the left side of the instrument
chassis.
5 Plug the APPI power supply into an AC outlet using the power cord
supplied with the APPI interface kit.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 6495B and is the answer not in the manual?

Agilent Technologies 6495B Specifications

General IconGeneral
BrandAgilent Technologies
Model6495B
CategoryAnalytical Instruments
LanguageEnglish

Related product manuals