EasyManuals Logo

Agilent Technologies 75000 Series B User Manual

Agilent Technologies 75000 Series B
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Installation Steps
Note If you ordered the DC Power Option (option 008) and you want to change the factory
switch settings, you should change them before doing the procedures in this chapter. The
factory switch settings are 0mA (no trickle charging of external battery) and non-latched
power-down operation. Refer to Appendix D of the Mainframe User’s Manual for details.
Step 1: Set Up Mainframe for AC Power (Page 1-3)
Step 3: Rack Mount the Mainframe (Optional) (Page 1-5)
Step 8: Connect Interface Cables (Page 1-16)
Step 9: Apply AC Power (Page 1-18)
Step 10: Connect External DC Power (Optional) (Page 1-19)
Step 11: Dow nload Device Drivers (Page 1-20)
Step 12: Verify Operation (Page 1-21)
Step 4: Determine Instrument Configurations (Page 1-6)
Step 5: Set Plug-In Module Logical Addresses (Page 1-9)
Step 6: Install Plug-In Modules (Page 1-13)
Step 7: Connect Bus Cables (Page 1-14)
Step 2: Select Internal IBASIC or External Controller (Page 1-4)
Wire Terminal Blocks (see individual plug-in module manuals)
1-2 Installing the System

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 75000 Series B and is the answer not in the manual?

Agilent Technologies 75000 Series B Specifications

General IconGeneral
BrandAgilent Technologies
Model75000 Series B
CategoryControl Unit
LanguageEnglish

Related product manuals