064355 - 06/2075
Page 31
SECTION 2
OPERATIONS
Before operation each day ensure the following:
• All guards, side screens and panels are in place.
• All safety and information signs are in place and legible.
• Engine oil levels are correct.
• Check battery level
• Check all operating controls for proper operation and adjustment.
• Check speed control operation before and after starting engine for proper operation.
• Gearbox oil level. Add oil as required.
• The steering, left and right.
Note: If there is any indication that faulty equipment exists, shutdown safely, inform the proper authority
and DO NOT operate the riding trowel until the problem has been xed.
• Remove loose objects that could interfere with operation.
Pre-Operating Instructions