EasyManua.ls Logo

Allied Telesis AT-GS924MX - Chapter 7: Powering On the Stack

Allied Telesis AT-GS924MX
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
87
Chapter 7
Powering On the Stack
This chapter contains the following procedures:
“Installing the Power Cord Retaining Clip” on page 88
“Powering On the Switches Individually” on page 89
“Powering On the Switches Simultaneously” on page 92
“Verifying the Stack” on page 94
“Monitoring the Initialization Processes” on page 97
Perform “Powering On the Switches Individually” on page 89 if you want to
control the assignment of the ID numbers to the switches of the stack. The
numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 92 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the Software Reference for
AT-GS900MX Series Switches, AlliedWare Plus Operating System.
Caution
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units. E79

Table of Contents

Related product manuals