EasyManua.ls Logo

Allied Telesis AT-GS950 - Page 41

Allied Telesis AT-GS950
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-GS950/48 Gigabit Ethernet Smart Switch Installation Guide
41
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 43.
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Management Session” on page 42. To start a remote management
session, the switch must have an IP address. For information about
giving the switch an IP address and starting a remote management
session, refer to the AT-S87 Management Software User’s Guide.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5

Table of Contents

Other manuals for Allied Telesis AT-GS950

Related product manuals