EasyManua.ls Logo

Alstom SF6 - Page 66

Alstom SF6
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Mounting the operating mechanism
P31--7901EN/02
2/8
01--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Preparing the operating mechanism
Unpacking
Remove the packing protection and check that the operating mechanism
marking corresponds to the circuit breaker pole.
Position
indicators
Check the operating mechanism position indicators statuses are as
follows:
Circuit--breaker
Open
Closing spring
Unarmed
Mechanism shaft
Check the seal (11) is present on the mechanism shaft (13).
Check lubricant (ASEOL 0--365.2) is present on the mechanism shaft (13).
13
11

Related product manuals