Installation
Erection general procedures
P31--0002EN/02
1/6
01--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Presentation
Introduction
During the erection of the circuit--breaker, some particular mounting or
checking operations will be realized.
In this module
This module contains the following topics :
Topic Page
Preparing and installing static seals 2
Screw sealing 3
Using a water pressure gauge 5