EasyManua.ls Logo

Alto-Shaam 750-SK

Alto-Shaam 750-SK
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
Del uxe Contr ol Cook & Hold Ser vic e Manua l MN- 4671 2 R ev 01 1 1/ 20
42
Continued from previous page
Check and tighten the cord connection inside of the appliance control area.
Inspect the control cooling fans (if applicable).
Measure the site voltage.
Inspect and adjust voltage monitor board if needed.
Inspect and test the product probe and product probe receptacle.
Inspect and test the control and control functions.
Inspect the cavity for structural integrity.
Inspect the door gaskets for correct shape and seal. Replace/repair as needed.
Inspect the door handle and hinges. Replace/repair as needed.
Inspect the full perimeter bumper.
Inspect the casters.
Do a cavity temperature calibration procedure per manufacturer’s
recommendations.

Other manuals for Alto-Shaam 750-SK

Related product manuals