EasyManua.ls Logo

Alutech CU-TR230-868 - Maintenance Service

Alutech CU-TR230-868
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONTROL UNITS UTR230868 / UTR400868 3131
MAINTENANCE SERVICE
Commissioning of the drive system can only be carried out after a successful verication. Partial
commissioning or temporary operation is not permissible.
Prepare and store the technical documentation for the automation kit. The documentation
should contain: installation and operation instructions, maintenance schedule, diagram
ofthe drive system and laying of electrical cables.
Pass the completed ‘Installation and Operation Manual to the consumer (owner).
Prepare a ‘Service Schedule and pass to the consumer (owner). Instruct about maintenance.
Instruct the owner of possible dangers and risks and the rules for safe operation. Inform
theowner of need to inform the door operator of the existing dangers and risks, as well
asthe rules for safe operation. Door managers must confirm by personal signature that they
know the rules for safe operation.
9. MAINTENANCE SERVICE
Perform scheduled maintenance as part of the entire drive system at least once every 6 months
or after 6,000 full cycles of operation:
Read the section ‘1. Safety Rules and Warnings. All rules and requirements must be followed.
Read the manuals of the drive system devices (electric drive, safety devices, controls, etc.).
All rules and requirements specified in the manuals must be followed.
Carry out an external inspection for the integrity and absence of damage to the door, drive,
devices of the drive system.
Clean the control unit and the drive system devices from dust, dirt, moisture. It is forbidden
to use water jets, high pressure cleaners, acids or alkalis for cleaning.
Carry out an external inspection of the drive and control unit parts, paying attention to the
corrosion and oxidation of the parts. Establish the need for repairs (replacement of all parts
and units that do not provide sufficient reliability).
Verify the integrity of the electrical cables and the connections.
Make sure that the threaded connections are properly tightened (bolts, screws, nuts of drive
fixing, the control unit fixing, fixing of the drive system devices, etc.).
Carry out the verification in accordance with the instructions in section ‘8. Verification
ofoperation and commissioning.
Enter information in section ‘14. Information on the performed works of the manual.
Indicate the current number of completed cycles (section ‘6.5. Cycle counter data’).
Y
After the end of the service life of the product, the specialist should assess the possibility offurther
operation and the need for repairs (replacement of the most critical units and parts).

Related product manuals