Pega 367 with Fanuc 04PC User Pre-installation Guide ©Amada America, Inc.
Print Date 03/07/2001 Revision 4.0 This document available on the World Wide Web at http://www.amada.com Page 1 of 35
Pega 367 with Fanuc 04PC User Pre-installation Guide
Amada America Inc.
7025 Firestone Blvd.
Buena Park CA. 90621
Phone: (714) 739 2111
Fax.: (714) 739 4099
Email info@amada.com
Question and Answer IconNeed help?

Do you have a question about the Amada Pega 367 and is the answer not in the manual?

Amada Pega 367 Specifications

General IconGeneral
BrandAmada
ModelPega 367
CategoryPower Tool
LanguageEnglish

Summary

Warning

Introduction

Specifications - Motion Package

Specifications - Punching System

Turret Configuration - 44 Station

Turret Configuration - 58 Station

Specifications - Fanuc 04PC Controller

Supply Requirements - Electrical

Installing the Electrical Power Supply

Supply Requirements - Pneumatic

Installing the Pneumatic Supply

Details the connection of a compressed air system to the Pega 367, noting pipe size, pressure, and volume.

Planning the Location of the Pega 367

Moving the Pega 367

Provides guidance on safe and professional methods for lifting and moving the Pega 367 machine.

Plan View - Pega 367

Plan View - Pega 367 with P357hs conveyor

Plan View - Pega 367 with V367hs conveyor and MP1530 loader

End View - Pega 367

Elevation View - Pega 367

Foundation Requirements

Foundation Anchoring Procedure

Foundation J-bolt Detail

Illustrates the detail of the J-bolt anchoring method, including dimensions and components.

Plan View - Foundation Pega 367

Diagram showing the top-down layout of anchor bolt placement for the foundation.

Elevation - Foundation Pega 367

Diagram illustrating the cross-section of the foundation with anchor bolt placement.

Saw Cut Holes J-Bolt Mounting Method

Core Drill Holes J-Bolt Mounting Method

Foundation / Floor J-bolt Mounting Procedure

Drilled Holes with Anchor Rods and Adhesive Mounting Method

Removing the Protective Coating

Machine Leveling

Rocking Test

Procedure to test machine frame stability and balance using G-code after leveling.

Floor Condition: Crowned

Addresses leveling issues on a crowned floor, recommending half-shims for stability.

Floor Condition: Sloped

Addresses leveling issues on a sloped floor, recommending half-shims for stability.

Leveling Procedure

Step-by-step instructions for leveling the machine frame using shims and a bottle jack.