19
Secure the trap to the cabinet using two screws
Hose #6
Hose #5
Hose #11
Front Cover
Pressure Switch
Tube Location
Figure 26
Minimum 5 ½” clearance is required for the drain trap beneath
the furnace.
*See Front Cover Pressure Switch Tube Location on Figure
26.
”
”
”
inserting the two screws through the large set of holes in
Insert flange. Cut 2 ½” long
.RF000142
2 ½”
Figure 27