M O D E L 2 1
O P E R A T
I O N M A N U A L
14
1414
14
5.4
5.45
.4
5.4
STARTUP PRELIMINARY CHECKLIST
STARTUP PRELIMINARY CHECKLISTSTARTUP PRELIMINARY CHECKLIST
STARTUP PRELIMINARY CHECKLIST
Interface purge is connected to Arc Gas Output
Controller is plugged in (Does not apply to 207)
Foot pedal is connected (F Mode Only)
Remote pendent is connected (Optional)
Weld head interface cable is connected
Ground and electrode cables are connected
Air/Argon line is connected and set at 50 PSI
Controller power switch is in the ON position
5.5
5.55.5
5.5
OPERATION PRELIMINARY CHECKLIST
OPERATION PRELIMINARY CHECKLISTOPERATION PRELIMINARY CHECKLIST
OPERATION PRELIMINARY CHECKLIST
Collets are installed and fully seated
Correct length electrode is installed
Center pin cycles up and down
Weld head calibration procedure completed