EasyManua.ls Logo

Anzzi SP-AZ078 - Step 3: Handshower Installation

Anzzi SP-AZ078
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
pg. 6
STEP 3
INSTALLATION (HANDSHOWER)
Insert the shower holder through the pre-drilled hole on the shower panel.
Connect the water supply hose to the shower holder,as shown.
Make sure all washers are inserted to prevent leakage.
Once the shower panel is fully installed and hung on the bracket, you can install the hand
shower hose to the holder connection.
3-1
Connecting the hand shower to the hose, as shown.3-4
3-2
3-3
Have questions? Call us at 305-614-4070 or visit us at www.ANZZI.com

Related product manuals